Campus Masterplan
A purpose-built campus for AI infrastructure.
Wolverine's flagship deployment — one of several sites in the active portfolio.
Industrial-zoned land masterplanned for phased build-out at this flagship site, with infrastructure zones laid out for parallel commissioning rather than sequential dependencies.
Site Plan
Conceptual masterplan — phased deployment from launch to full build-out.
A site-level view of the largest contiguous deployment in the Wolverine portfolio. Other portfolio sites apply the same modular architecture, configured to the requirements of the customer they serve.
Site Specs
Sized for the portfolio's 180 MW build-out ceiling.
Connectivity & Access
Utility, fiber, and logistics access — engineered together.
- Utility Interconnect 3 substation feeds, N+1 redundancy
- Fiber Routes Diverse-path carrier routing
- Road & Highway Access 3 miles to Interstate 40
- Water Service Municipal water service on-site
- Natural Gas Service Natural gas service on-site for standby generation
- Telecom Carrier Availability Multi-carrier telecom availability
Wolverine's location was selected against the same criteria the platform applies to every infrastructure decision: utility readiness first, expansion optionality second. The site sits on industrial-zoned land with active substation interconnections, diverse fiber routing, and the road and pipeline access that institutional-scale AI infrastructure requires from day one.
Regional power market positioning matters as much as on-site infrastructure. The platform's contracted capacity sits within a market where utility availability is the gating constraint for new AI deployments — turning location into a structural moat rather than a generic site-selection exercise.